From inside and outside you can see the new addition to the main building. The upper floor of this addition is a wing for Special Education. On the main floor, this new addition will house the library. The bottom floor of the addition will be an incredibly large new cafeteria. |
|
This is a picture of the new "covered play area". It is much more spacious and light than we thought it would be. Right now the ground here is covered with materials for the project and gravel. By the time students use it there will be new blacktop on it. |
|
![]() |
Here is a picture of Mr. Sawin with two of the workers on the project. The man on the left is Matt. He is the assistant project manager. Both workers were very interested in our web pages and the pictures we took with the digital camera. We asked them if the project was on time. They said, "YES!" We should get to move into the new McDermoth on schedule. |
|
This is the view from the third floor of McDermoth of the playground. There are piles of lumber and stones and the contractor's trailer on the playground now. |
|